Almost ready to move into the new house. Over the past month and a half we have had new tile floors put in the kitchen, eat in kitchen, laundry room and back bathroom. Painted every single room. Replaced toilets, bathroom faucets, kitchen faucet. New built in double oven, which required some remodeling. New dishwasher. Basement window well drainage put in. Brick work done outside the house on the chimney and on the front of the house. New locks and door handles, new thermostat, window air conditioner for the upstairs girls bedroom since the central air didn't seem to be quite handling it up there,...
I'm tired just listing all of that. And that was just the major projects. There were so many little things along the way.
Wood floors will be finished within the week, which then means we can actually move in. What a summer. Can't wait for everyone to come by and visit.